San Francisco-Oakland East Bay Bridge Replacement Project: Precast Prestressed Concrete Skyway

Professor Frieder Seible

Dr. Seible led the proof-testing of the new San Francisco-Oakland East Bay Bridge, including the 2.5 km long precast-prestressed concrete skyway. Joints between superstructure segments and the skyway piers were tested at 1/4 scale under simulated seismic loads to establish performance limit states.

1